Application Report from the Treatment Plant in Luckenwalde, Germany
Answer
The Luckenwalde treatment plant, opened in 1998, needed to expand its measurement technology. In particular, the strongly fluctuating influent conditions (heavy rain, purged channels, etc.) and the associated high nitrogen and phosphorus loads sometimes made it difficult to comply with the discharge consent values.
  • Lack of reliable compliance with the consent values
  • High precipitant consumption
  • Manual metering, or metering proportional to the influent