What is the maintenance frequency required for the QBD1200 analyzer?

Document ID

Document ID TE9921

Published Date

Published Date 06/22/2022
Question
What is the maintenance frequency required for the QBD1200 analyzer?
Summary
QBD1200 analyzer maintenance
Answer
The following items should be replaced at least once per year:
- User Instructions, UV Lamp Replacement, Qbd1200_DOC276.97.80470(Product # 9449200)
- User Instructions, Syringe Replacement: 9449900_DOC276.97.80472 (Product # 9449900 for syringe and Product # 9456000 for the complete syringe pump)
- User Instructions, Ozone Destructor Replacement: 9449300_DOC276.99.80471(Product # 9449300). 

Note: User Instructions, Tubing Replacement, 9459100_DOC276.97.80468(Product # 9459100) should be replaced as needed.

Was this answer helpful?

Submitting...
Thank you for your feedback!
There was an error with your submission. Please try again.